Sand Making Machine Feed Pipe Liner Adjustment and Change Step Method
<p>After the ultra-fine sand-making machine is used for a period, the
internal parts are worn to a certain extent and need to be replaced.
Today, Change Heavy Industry, our manufacturer, will introduce you to
the adjustment of the tube bushing of the ultrafine sand-making machine:</p><p><br/></p><p>1.
Adjust using the feed pipe gasket so that the top of the feed pipe
lining is set at the end of the feed chute entering the rotor.</p><p><br/></p><p>2. Adjust/replace the feed liner by following the steps below:</p><p><br/></p><p>Step
1: Remove the crosshead knob, then loosen the hopper mounting bolt and
pipe mounting bolt, and remove the hopper/pipe assembly.</p><p><br/></p><p>Step
2: Remove the protective casing, loosen the water inlet bushing
mounting bolt, and remove the water inlet gasket from the bolt. Then,
remove the feed tube bushing and feed tube gasket.</p><p><br/></p><p>Step
3: When adjusting, pull out the water pipe washer, place it on the
water pipe bushing flange, install it on the water pipe bushing, and
then tighten the water pipe bushing installation bolt. Put on the
protective cover and install the catheter and hopper assembly. As a
guide to level adjustment and changing the feed tube bushing, note
whether the top is inserted into the rotor during daily inspection,
periodically check the feed tube bushing inside the mark, and adjust or
change the wear mark to new levels.</p><p><br/></p><p>When changing the
pipe lining of the sand-making machine, pay attention to replacing the
pipe lining and restoring its original state. When the feed tube bushing
wears out, replace it and adjust the feed tube bushing without changing
the hopper position. Up to three layers of gaskets are used to adjust
the inlet pipe lining. When the lining of the water inlet pipe is
further worn, replace it. Remember to install it as is when replacing
the water inlet pipe bushing.</p>
发布日期:2025-01-23